SUSTAINABILITY

What do we mean by “sustainability”?

Sustainable development, according to the Brundtland Report (1987), is defined as development that “meets the needs of the present without compromising the ability of future generations to meet their own needs.” In the construction industry, this approach means the balanced integration of environmental, social, and economic considerations. Accordingly, a sustainable built environment is one that is livable for its users, places an acceptable burden on the environment, and is economically fair and viable in the long term.

 

KÖZTI Sustainable Design Strategy

The impacts of climate change, along with the significant environmental burden and resource demands of the construction industry, have made it necessary to rethink traditional design approaches. KÖZTI’s Sustainable Design Strategy is a flexible and forward-looking response to these challenges, aiming to reduce negative impacts across the entire lifecycle of construction projects. The strategy is not merely reactive to change but applies a proactive, future-proof approach.

Technically, it functions as an additional design support framework that facilitates the conscious, structured, and timely integration of sustainability considerations into architectural design. It is based on a dedicated expert team, a continuously evolving internal knowledge base, regular training programs, as well as detailed methodological and documentation support.

Rather than operating as a rigid protocol, the strategy is adaptable to individual projects. As such, it primarily serves as a decision-support tool, supported by comprehensive data analysis, evaluation, and advisory services.

 

The role of the strategy in the design process

Unlike traditional design practices, sustainability considerations are introduced at an early stage in a data-driven and analysis-based approach. Site conditions and constraints are assessed from the outset, making decisions more transparent and better founded, while optimization of sustainability potential begins already during the conceptual phase.

 

Sustainable design objectives

KÖZTI aims to create a built environment that meets environmental, social, and economic sustainability requirements simultaneously. The resulting buildings are environmentally conscious both in relation to their natural and built surroundings, provide healthy and harmonious living environments for people, and operate in an energy-efficient manner throughout their entire lifecycle.

 

Structure of the Sustainable Design Strategy

  1. Corporate-level Sustainability Strategy – general guidelines and shared foundation.
  2. Project-level definition – for each project, sustainability is defined jointly with the client and project stakeholders. This establishes a shared, project-specific interpretation of what “sustainable” means in that particular context and serves as the starting point.
  3. Definition of sustainability levels (minimum, optimum, maximum) – and allocation of requirements depending on project type.
  4. Sustainability matrix – a structured overview of available tools, focus areas, and synergies.
  5. Project-specific strategy – a prioritized and feasible set of measures derived from the interrelated analysis and evaluation of the matrix options.

 

Integrated design process

Sustainability considerations accompany the entire design process from concept development to detailed design. In the initial phase, objectives and principles are defined, followed by analysis and evaluation of alternatives. This is followed by refinement of decisions and interdisciplinary integration. In the detailed design phase, solutions are developed in detail, concluding with recommendations and requirements that support sustainable construction and operation.

 

Sustainability throughout the project lifecycle

KÖZTI’s approach considers the entire lifecycle, including carbon footprint assessment, circular economy principles, analysis of natural site conditions and microclimate, as well as energy efficiency and indoor comfort. The goal is healthy, environmentally responsible, and long-term sustainable operation.

Principles and vision

The corporate-level Sustainable Design Strategy is flexible and adaptable to changing environmental, market, and regulatory conditions. It is open to innovation, including digital and AI-based solutions, and demonstrates KÖZTI’s professional commitment.

In this interpretation, sustainability is not a constraint but a design opportunity: a tool that supports architecture’s long-term value-creating role, which has been an integral part of KÖZTI’s design philosophy for more than 70 years.

 

Munkáink
HÉVÍZ LAKE BATHS AND MECIDAL...
CONSERVATION OF THE PUSZTATEMPLOM CHURCH...
New collection centre of the...
BUDAPART BRI RESIDENTIAL BUILDING
HUNGARIAN ACADEMY OF SCIENCES HEADQUARTERS...
CONSERVATION OF THE HETYE CHURCH...
CONSERVATION OF THE SOMOLY CHURCH...
Sasad Resort phase 9 and...
HOTEL ESSENCE
HÁRSFA KINDERGARTEN
UNIVERSITY OF PÉCS – OMICS...
BUDAPART BRN RESIDENTIAL BUILDING
NEW EXHIBITION BUILDING OF THE...
SLACHTA MARGIT STUDENT HOSTEL
Hotel Budapest reconstruction – Marriott...
PÁZMÁNY PÉTER CATHOLIC UNIVERSITY CAMPUS
KÁROLI GÁSPÁR UNIVERSITY OF THE...
VESZPRÉM PETŐFI THEATRE COMPLEX DEVELOPMENT
KELENFÖLD-ŐRMEZŐ INTERMODAL JUNCTION
FAUSTO’S – EXTENSION AND TRANSFORMATION...
CONSERVATION OF THE VARJASKÉR CHURCH...
CONSERVATION OF THE CSÁKÁNYOSPUSZTA CHURCH...
Marina City A4, A5, and...
Ranolder János Roman Catholic Primary...
SEMMELWEIS UNIVERSITY, BASIC MEDICAL SCIENCE...
CBZ BANK HEADQUARTERS, HARARE, ZIMBABWE
MEXIKÓI ROAD P+R MULTISTORY CAR...
RENEWAL OF THE OLD CHURCH...
UNIVERSITY OF PANNONIA CAMPUS RENEWAL...
BUDAPART BOG HOTEL AND OFFICE...
CONFERENCE HALL AND APARTMENT BUILDING,...
BALATONFÜRED CONGRESS CENTER
SAILING HARBOR BUILDING, BALATONFÜRED
ENVIRONMENT FRIENDLY RENEWAL OF THE...
CONSERVATION OF THE KÖVESD CHURCH...
RECONSTRUCTION OF THE HURAY VILLAS,...
WHITE RAVEN SKYBAR, HOTEL HILTON...
LUA RESORT, BALATONFÜRED
MCC RÉVFÜLÖP RESORT AREA DEVELOPMENT
MULTIFUNCTIONAL CONFERENCE AND EVENT CENTER,...
SEMMELWEIS UNIVERSITY, TÖMŐ UTCA CLINIC...
RECONSTRUCTIONS IN THE BUDA CASTLE...
NYÍRŐ GYULA HOSPITAL, BUDAPEST –...
MVM DOME MULTIFUNCTIONAL EVENT HALL,...
MULTISTOREY CAR PARK, SOPRON
Lőver SWIMMING POOL, SOPRON
DEBRECEN INTERNATIONAL AIRPORT NEW TERMINAL...
LUTHERAN KINDERGARTEN, ASZÓD
SZÁDVÁR CASTLE RUIN – CONSERVATION...
V30 DOWNTOWN SPORTS CENTRE
EIFFEL ART STUDIOS – NEW...
LISZT FERENC INTERNATIONAL AIRPORT T1...
BUDAPART BRD RESIDENTIAL BUILDING
PUSKÁS ARENA
GTC WHITE HOUSE OFFICE BUILDING
LISZT FERENC INTERNATIONAL AIRPORT T2B...
KLAPKA STREET RESIDENTIAL AND COMMERCIAL...
DVTK FOOTBALL STADIUM, DIÓSGYŐR
NATIONAL UNIVERSITY OF PUBLIC SERVICE...
LOWER CASTLE RECONSTRUCTION, FÜZÉR
SAINT PANTALEON HOSPITAL, DUNAÚJVÁROS –...
ERZSÉBET TEACHING HOSPITAL, SOPRON –...
SZEGED CLINICAL CENTRE, EMERGENCY DEPARTMENT...
KOSSUTH SQUARE RECONSTRUCTION – VISITOR...
CASTLE GARDEN BAZAAR
KECSKEMÉT HEALTH CENTRE
LISZT FERENC ACADEMY OF MUSIC...
SEMMELWEIS HOSPITAL, KISKUNHALAS – RECONSTRUCTION...
HOTEL BAMBARA
PETZ ALADÁR COUNTY TEACHING HOSPITAL,...
UNIVERSITY OF SOPRON – NATURAL...
KÁLVIN SQUARE RECONSTRUCTION
KÖZTI HEAD OFFICE
EUROPEAN YOUTH CENTRE BUDAPEST –...
LISZT FERENC INTERNATIONAL AIRPORT –...
HOUSE OF DIALOGUE
HOTEL ROYAL PARK
UNIVERSITY OF SOPRON – SCIENCE...
GTC METRO OFFICE BUILDING –...
FRESENIUS MEDICAL CARE DIALYSIS CENTRE
GRASSALKOVICH PALACE, GÖDÖLLŐ – RECONSTRUCTION
SASAD RESORT RESIDENTIAL ESTATE, PHASE...
HOTEL MARMARA
SOHO HOTEL
ROSEHILL RESIDENCE
OFFICE OF THE UN HIGH...
RIVERLOFT APARTMENT AND OFFICE BUILDING
MEDGYASZAY-HOUSE, NAGYKANIZSA – RECONSTRUCTION AND...
IBIDEN FACTORY PHASE 2, DUNAVARSÁNY
HUNGARIAN NATIONAL MUSEUM – RECONSTRUCTION
INNOVATION CENTRE, SOPRON
PANNONHALMA BENEDICTINE ARCHABBEY – RECEPTION...
RADISSON SAS BIRDLAND RESORT &...
INDOOR SWIMMING POOL, HÓDMEZŐVÁSÁRHELY
RIVERSIDE APARTMENT BUILDING
BUDAPEST SPORTS ARENA AND URBAN...
PRACTICE ICE RINK
UZSOKI STREET HOSPITAL, BUDAPEST –...
CORINTHIA BUDAPEST HOTEL
SÁNDOR PALACE RECONSTRUCTION
GANDHI GRAMMAR SCHOOL AND SPORTS...
DOROTTYA COURT OFFICE BUILDING
ÚJ UDVAR CINEMA (BUDA EVENTS...
ÓBUDA GATE OFFICE BUILDING
RENTABLE OFFICE BUILDING, BUDAÖRSI ÚT
EMBASSY OF THE HUNGARIAN REPUBLIC...
KNORR–BREMSE RESEARCH AND DEVELOPMENT CENTRE
DENSO MANUFACTURING HUNGARY PLANT, SZÉKESFEHÉRVÁR
EMBASSY OF THE HUNGARIAN REPUBLIC...
ÁB-AEGON OFFICE BUILDING RECONSTRUCTION
SAINT BORBÁLA HOSPITAL, TATABÁNYA –...
NYÍRŐ GYULA HOSPITAL – PSYCHIATRIC...
FORMER DIGITAL (COMPAQ) OFFICE BUILDING
OFFICE BUILDING (FORMER HEADQUARTERS OF...
LG ELECTRONICS OFFICE AND WAREHOUSE...
FEJÉR COUNTY SAINT GEORGE HOSPITAL,...
SEMMELWEIS UNIVERSITY TRANSPLANTATION AND SURGERY...
VILLAGE SCHOOL AND SPORTS HALL,...
SOS CHILDREN’S VILLAGE, KŐSZEG
KÖZTI–BAYER–ARTISJUS OFFICE BUILDING AND MULTIPURPOSE...